Electrolysis, Boston Water Works, Massachusetts Avenue at Harrison Avenue, gap in 30-inch pipe line where pipe injured by electrolysis was removed to make new connection, looking west (compare with Nos. 5968 and 5969), Boston, Mass., Oct. 26, 1905

Electrolysis, Boston Water Works, Massachusetts Avenue at Harrison Avenue, gap in 30-inch pipe line where pipe injured by electrolysis was removed to make new connection, looking west (compare with Nos. 5968 and 5969), Boston, Mass., Oct. 26, 1905

Item Information